Fort Bend County Toll Road Authority, Segment B-2 Extension
At a glance
Location
Fort Bend County, Texas
Client
Fort Bend Toll Road Authority
Project Summary
IMS is a major sub consultant (Design Engineer) supporting the Fort Bend County Toll Road Authority (FBCTRA) Program Manager (BGE Inc.) with the Segment B-2 Extension to the existing toll road system.
This project is one of FBCTRA’s major projects that involves a four-phase, multi-year project connecting Fort Bend Parkway Toll Road at Sienna Parkway (where it once terminated) to the Grand Parkway west of the Brazos River.
The first phase, Segment B-1, which spans from State Highway 6 to Sienna Parkway, opened for traffic in 2012. Segment B-2 will be four-lanes and will extend the Fort Bend Parkway Toll Road over Sienna Parkway to Sienna Ranch Road. The segment will include a northbound exit ramp and a southbound entrance ramp at Sienna Parkway. It will also include a northbound entrance ramp, a southbound exit ramp, and a signalized intersection at Sienna Ranch Road. Design work for Segment B-2 is schedule to begin late 2019 and be completed in 2020. Construction of the overpass and roadway is scheduled to begin in 2021 and will take 16 to 20 months to complete. Segment B-2 is scheduled to be opened in late 2022 or early 2023.